27.10.2008, 11:18 | #1 |
MCT
|
Серия вопросов консультантам-производственникам
1.Правильно ли я понял описание поля ProdType таблицы ProdTable
Цитата:
The production has been created without a specific attachment to an order, another production or vendor, or a planned order
Цитата:
Производство создано без дополниений к заказу, другое производство или поставщик или запланированный заказ.
Цитата:
Displays the desired delivery or finish date for the production. You can use the delivery date in the production's operations or job scheduling, where the scheduling can be selected backward from delivery date. If you perform operations scheduling or job scheduling for a production order that has automatic creation of underproductions defined in the bill of material, the delivery date for the underproductions is automatically set to the date when the items will be used in the production. The underproduction will then have operations scheduled backward from delivery date.
__________________
Axapta book for developer |
|
27.10.2008, 11:43 | #2 |
Участник
|
Нет.
Производство [может быть] создано без привязки к заказу на продажу, производственному заказу, закупке или к запланированному заказу. Другими словами, производство можно просто взять и создать вручную. Само по себе. Не ссылаясь ни на что. Цитата:
Слово образовно так же как и underdelivery и overdelivery (недопоставка и перепоставка). Задается процент допустимого отклонения. Если произведено меньше или больше в рамках допустимого отклонения, то у менеджера есть следующие варианты: а) ждать допроизводства/допоставки или б) принять то что получилось по себестоимости всего заказанного количества. |
|
|
За это сообщение автора поблагодарили: MikeR (1). |
27.10.2008, 12:09 | #3 |
MCT
|
Цитата:
По любому спасибо! Что то за всех консультантов один mazzy отвечает, они на этот форму не ходят?
__________________
Axapta book for developer |
|
27.10.2008, 12:28 | #4 |
Участник
|
|
|
29.10.2008, 17:42 | #5 |
MCT
|
Что то тяжко идет производственный модуль
1 Цитата:
The materials are described with item number and consumption, as well as a range of other data used for processing in the production system.
Production BOMs are based on Bills of material from the base data, as the production BOM is generated in connection with Production creation as a copy of a bill of material from base data. In that way, it is the bill of material for the item being produced in production, which is copied to the production BOM. The only exception is if the item has no bill of materials, and no BOM number was given upon its creation. In that case, the production BOM will be blank. Цитата:
Is used if items of type BOM are to be exploded in this production bill of materials. When a bill of material is exploded, it creates the raw materials and operations created as base data on the current bill of materials item number.
Explosion is carried out in connection with estimate. You will find more information on estimate in Estimation. Цитата:
If you in the production sequence use subcontractor work for which you want to create a purchase order automatically, use type Vendor.
Цитата:
Round using Measurement if raw material is available only with predefined dimensions. If you need to take the above into account when calculating the consumption, use rounding to Measurement and set RoundUpQty to 5. The rounding is calculated by first determining the sales quantity on the basis of the measurement dimensions and then determining the number of times the measurement dimension figure can be included in RoundUpQty The sales quantity is then rounded down to 0 (zero) decimals. Now you can estimate the quantity by calculating how many multiples of the value in field RoundUpQty is to be used in order to produce a given quantity.
Цитата:
When you use Rounding-up Consumption the calculated estimated quantity is always rounded so that it can be divided equally with the value of RoundUpQty Rounding-up to Consumption is used when the total consumption of a raw material only can be carried out using a pre-defined quantity and the remainder is then regarded as loss
__________________
Axapta book for developer |
|
29.10.2008, 19:52 | #6 |
Участник
|
В Аксапте переведено как "Искусстевенный"
У остальных так и переводится "Фантомная спецификация" Суть - мы создали Фантомную спецификацию (как правило полуфабрикат). Включили эту спецификацию в другую спецификацию 2. Когда создается производственный заказ на производство Спецификации 2, то никогд не создается отдельный производственный подзаказ для производства фантомной, все материалы фантомной просто добавляются в Спецификацию 2 на тот уровень, где была Фантомная спецификация. Для чего это нужно? Есть какой-то типовой бизнес-процесс в производстве. В этот бизнес-процесс всегда идут одни и те же материалы/полуфабрикаты, но они никогда не производятся отдельно. |
|
|
За это сообщение автора поблагодарили: MikeR (1). |
29.10.2008, 21:31 | #7 |
MCT
|
а это что за зверь "subcontractor work" ?
__________________
Axapta book for developer |
|
29.10.2008, 21:54 | #8 |
Member
|
Цитата:
Сообщение от mazzy
...
(как правило полуфабрикат). ... Просто в Аксапте под разные варианты исполнения продукции могут создаваться отдельные спецификации. В результате спецификаций получается много. Аксапта в этом проблемы не видит. Если много спецификаций отличается какой-то мелочью, то лучше создать одну фантомную, и включить ее во все остальные + дельта. Это облегчает технологам процесс внесения изменения в основную часть спецификации. Иначе им придется много всего отслеживать чтобы изменить норму расхода какого-то материала в основной части спецификации.
__________________
С уважением, glibs® |
|
|
За это сообщение автора поблагодарили: gl00mie (2). |
Теги |